St Joseph School
Turnhout
Since 1 September 2022, the kindergarten has welcomed its new pupils in a new building. The school was officially opened on Friday 21 October 2022. The old building has been renovated and a new section has been added. There are several classrooms, a gymnasium and an indoor playground.
The light in the classrooms, gymnasium, corridors, offices and indoor playground can be easily switched via a control panel with 8 scene buttons. A total of 65 control panels have been commissioned. All the lights can also be switched on and off at once from the main entrance. The various light scenes were designed in consultation. The light management system also had to be child-proof and provide a warm appearance. Furthermore, it had to be easily operated by different users. Finally, it was also important for this project that it should be possible to light a room in different ways. So the lighting in the same room can be divided into zones and these zones can be lit individually.
Steven Claessens | Technical sales consultant
Contact the sales consultant in your area!